BRIDGESTONE AMERICAS AKRON DATA CENTER UPGRADE

Technology

BRIDGESTONE AMERICAS AKRON DATA CENTER UPGRADE

This project involved the complete remodel of the office building and corporate data center. Specific scope items include: » new N+2 electrical service » new cooling for data space » significant architectural upgrades » new preaction fire suppression system » new generator yard » administration office space remodel
Client Bridgestone
Location Akron, OH
Square Footage 84,000.00
Project Budget $9.5 Million
JP MORGAN CHASE MAIN EQUIPMENT ROOM RENO

Technology

JP MORGAN CHASE MAIN EQUIPMENT ROOM RENO

This project involved converting an existing office cubicle farm into the main equipment room. New spaces include a new main equipment room, vendor area, staging room, fire alarm/sprinkler room, electrical room, UPS system A & B rooms, an alcove/ramp entrance area, new building automation system for MER rooms, new double interlock pre-action fire suppression system and a state-of-the-art fire alarm system.
Client JP Morgan Chase
Location Columbus, OH
Square Footage 3,379.00
Project Budget $5 Million
POLYONE CORPORATION DATA CENTER

Technology

POLYONE CORPORATION DATA CENTER

Phase I involved expansion of the existing space to accommodate “A” and “B” side power rooms. Phase II involved major electrical upgrades to the new “A” side electrical system. Work also included new power whips and a grounding grid of the data center environment. During the project, the existing data center and corporate operations continued with “0” downtime.
Client PolyOne
Location Avon Lake, OH
Square Footage
Project Budget $750,000
MACY'S LORAIN DATA CENTER | PHASES 1,2 & 3

Technology

MACY'S LORAIN DATA CENTER PHASES 1,2 & 3

鶹ý of three new electrical rooms to accommodate redundant power. Scope included demolition/abatement of existing interiors, masonry knee wall containment, raised access flooring, pre-action sprinkler system with VESDA smoke detection, new mechanical CRAC units, and new main service electrical connections. Electrical work included installation of a new generator, ATS’s, UPS’s, transformer, and dual feed network power
Client Macy's
Location Lorain, OH
Square Footage 10,750.00
Project Budget $1.5 Million
ST. ELIZABETH BOARDMAN HEALTH CENTER

Healthcare

ST. ELIZABETH BOARDMAN HEALTH CENTER

New construction of a patient tower, installation of a storm water management plan, reorganization of the facility’s parking plan (including a new parking garage) and re-programming of the existing facilities. Details included: new private patient rooms, 12 labor and delivery rooms, 32 post-partum rooms and 32 med/surgical units.
Client Mercy Health
Location Boardman, OH
Square Footage 242,080.00
Project Budget $60 Million
UH GEAUGA PHARMACY

Healthcare

UH GEAUGA PHARMACY

A new structure that was completed in approximately 8 months and is home to an updated pharmacy operation that meets new regulations. Existing underground utilities were relocated/modified and the new steel structure ties into portions of the existing structure.
Client University Hospitals
Location Geauga, OH
Square Footage 5,000.00
Project Budget $5 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon